Every November the phone gets quieter, and every November someone asks me the same thing: can you still build my deck before spring? Most of the time the answer is yes. We build decks right through the winter in Newmarket, Aurora and the rest of York Region, and some jobs go better in the cold than in a wet April.

Not every deck, though, and the way we work changes once the ground freezes. Here is what changes, what costs a little more, and when I tell people to wait.

Raised pressure-treated deck on posts and beams built by XP Decking on a brick house in York Region

Why Winter Building Works Better Than People Expect

The building departments in Newmarket, Aurora and Richmond Hill work all year. Footing and framing inspections go ahead in January the same as in June; we simply book them around snowfall.

Frozen ground is also kind to your yard. A loaded wheelbarrow or a mini excavator on a wet spring lawn leaves ruts you will be fixing all summer. On frozen ground it leaves almost nothing. And a deck finished in February is a deck you use from the first warm weekend, instead of one you are waiting for while everyone else is booking crews.

The Real Challenge: Footings in Frozen Ground

Every footing we pour goes below the frost line, which is about 1.2 m (4 ft) across York Region. In summer that is an hour of auger work per hole. In January the top layer is frozen hard, so the work changes.

Screw piles

A screw pile is a steel shaft driven into the ground by machine. It cuts through frozen soil, it carries load as soon as it is in, and there is no concrete to cure. For most winter decks this is the cleanest option, and it is the one I suggest first. The main reason not to use them is access: the machine needs a path into your yard.

Poured concrete in winter

Concrete still works in winter if you respect it. We cut through the frozen crust with a power auger, dig to full depth and never pour onto frozen soil. Once the concrete is in, the tops of the forms go under insulated blankets so the concrete cures instead of freezing. It adds time and some cost, but a properly protected footing is as strong as one poured in July.

Cardboard footing form with a steel post bracket set by XP Decking before the ground froze
A footing form and post bracket we set in late October, a few weeks before the ground froze.

If you want the details on each footing type, I wrote a separate guide on deck footings that survive an Ontario winter, and another on post bases and hold-downs.

What Winter Does to Framing and Deck Boards

Framing in the cold is mostly a matter of keeping the lumber dry and the crew warm. Pressure-treated lumber arrives wet, and in winter it stays wet longer, so we space and fasten it with that in mind.

Composite and PVC boards shrink in the cold and grow in the heat. The manufacturers publish gapping charts by installation temperature, and in winter we follow the cold end of those charts so the boards do not buckle in July. We also let boards warm up in the truck or a garage before we rip them, because a frozen board cuts rougher.

Grey composite stairs and stringers built by XP Decking in mid November
Composite stairs we finished in the middle of November.

The one thing that does not happen in winter is stain. Every deck stain has a minimum temperature on the can, and an Ontario January is below it. If you are building in pressure-treated wood, the deck goes in now and the stain goes on in spring. My guide to deck stain and paint covers what to use when the time comes.

Table comparing deck building from spring to fall with November to March: footing holes, concrete, inspections, framing and boards, staining and lawn damage

Permits and Inspections in Winter

Nothing about the permit changes. We prepare the drawings, file the application and book the inspections, the same as any other month. Review in Newmarket is usually one to two weeks for a complete application, and towns with conservation authority review take longer. My guides to deck permits in Newmarket and to deck permits in Aurora, Richmond Hill and Vaughan set out the rules for each town.

The footing inspection is the one that needs planning. The inspector wants to see the holes or the piles before anything covers them, so we schedule the dig for a day when the inspector can come and the forecast is not calling for a foot of snow.

What Costs More in Winter, and What Does Not

Materials cost the same. What changes is time: clearing snow off the work area each morning, cutting through frost, keeping concrete warm, and shorter days. On a typical deck that adds a day or two of labour, sometimes less if we use screw piles. Your quote lists those items separately, so you can see exactly what winter adds before you decide. For the usual price ranges, see what a deck costs in each York Region town.

When I Tell People to Wait for Spring

  • The yard needs grading. If water pools where the deck will go, that has to be fixed with the ground thawed.
  • You want a stained wood deck finished in one go. The stain will wait for spring either way.
  • Landscaping is part of the job. Planting beds, stone and sod around the deck belong in spring.
  • A low floating deck on deck blocks. Blocks sit on the surface, and setting them on frozen ground means they settle when it thaws.

Where We Build Through the Winter

We work all winter from our base as a deck builder in Newmarket, and across the rest of York Region: we are a deck builder in Aurora, a deck builder in Richmond Hill and a deck builder in King City, among others. Cottage jobs in Muskoka and Kawartha Lakes depend on road access, so for a deck builder in Muskoka we plan winter work case by case.

If you would rather see the work first, our photos are in Our Works and the reviews are on our Google Business Profile in Newmarket. When you are ready, book a free site visit and I will tell you honestly whether your deck is a winter job or a spring one.

Frequently Asked Questions

Is a deck built in winter as strong as one built in summer?

Yes, as long as the footings are done right. Screw piles carry load immediately, and concrete poured below the frost line and kept from freezing while it cures reaches the same strength as summer concrete.

Do the building inspectors work in winter?

Yes. Newmarket, Aurora, Richmond Hill and Vaughan inspect all year. We book the footing inspection around the weather so the holes are open and clear when the inspector arrives.

Can composite decking be installed in the cold?

Yes. We set the board gaps for the installation temperature using the manufacturer's chart and warm the boards before cutting. Composite needs no stain, so a composite deck can be fully finished in winter.