Fence Installation in Newmarket

Privacy Fences, Replacements and Repairs

A fence contractor for Newmarket and York Region: pressure-treated privacy fences, board-on-board, horizontal slat toppers and matching gates. Posts go in below the frost line, lines get checked against your survey, and we know the town’s fence by-law. As a fence and deck company, we also tie fences into decks and privacy screens.

Get Fence Installation Quote Read Our Google Reviews

Yes, We Are Affordable.
No Compromised Quality.

Get 100% FREE No-Obligation Quote.

Please complete this field.

Please complete this field.

Please complete this field.

Please complete this field.

Please complete this field.

Run of pressure-treated fence panels with an open slat topper along a property line in Newmarket, with planting beds at the base

A Fence Contractor Who Checks the Property Line Before the First Post Hole

Two things sink a fence project, and neither of them is the fence. Build eight inches over the property line and you are moving the whole run. Set a post above the frost line and it will be leaning within three winters.

So we start with your survey and agree the line before anything is dug, then auger below the frost line and set every post in concrete. The boards are the part you see. The posts decide how it looks in five years.

Get My Fence Quote

Our Fencing Services in Newmarket

New fence installation, full replacement of a fence that has had its day, gates that actually close, and repairs where a repair is genuinely the right call.

Privacy Fence Installation

The standard request and the one we build most: a solid pressure-treated or cedar privacy fence at the height your yard allows, with posts set in concrete and a capped top rail to keep water out of the end grain.

Board-on-Board and Horizontal Slat Fences

Board-on-board overlaps the pickets so no gap opens when the wood shrinks. A horizontal slat topper adds height and light without a solid-wall look, and it is the detail we are asked for most often now.

Fence Replacement and Removal

We take out the old fence, dig out the old concrete, dispose of everything and build new. Removing old footings properly is the step most quotes quietly skip, and it is why some new fences end up with posts in the wrong place.

Fence Repair and Post Replacement

Leaning posts, sagging panels, a section flattened by a storm, gates that have dropped. If the run is fundamentally sound we replace what has failed rather than selling you a whole fence.

Gates, Latches and Hardware

A gate is the part of a fence that moves, so it is the part that fails. We build gates with proper bracing and hang them on heavy hardware, and we will square up a dropped gate on an existing fence.

Privacy Screens and Deck Enclosures

Sometimes the answer is not a taller fence but a privacy screen on the deck, where the by-law allows more height. We build these to match the deck rather than bolting on a panel that looks like an afterthought.

Fence Materials and Finishes, and What They Do Here

Most fences in this area are pressure-treated, and for good reason. Here is what we build with most, and how it behaves through an Ontario year.

Close view of pressure-treated spruce fence boards with a capped top rail on a fence we built in Newmarket

Pressure-Treated Spruce and Pine

The default, and a sound one. Cheap, strong, widely available and treated to resist rot in ground contact. It will move as it dries, so board spacing and fastening matter. Stain it after a season and it will look far better for far longer.

Open horizontal slat topper above a solid pressure-treated fence, adding height without a solid-wall look

Horizontal Slat Toppers

An open slat section above a solid fence buys you height and light without the solid-wall look. It is the detail we are asked for most often now, and it works on both cedar and treated runs.

Dark-stained horizontal fence boards on a deck enclosure, showing how a stained finish holds its colour

Stain It, or Let It Weather

Bare pressure-treated wood turns silver-grey in about a year and a half here. Stained, it holds its colour, sheds water far better and checks less. Let it dry out for a season first, because staining wet lumber is money wasted.

We also build in western red cedar, cedar boards on pressure-treated posts, and composite or vinyl panels. We haven't shown those here because every photo on this page is our own work. Ask and we will talk you through the trade-offs and show you a job in progress.

Newmarket Fence By-law: Heights, Permits and Pools

These are the numbers from the Town of Newmarket's fence by-law. If you are in Aurora, Bradford or elsewhere in York Region, the figures differ, and we check yours before quoting.

Town of Newmarket fence by-law, at a glance
Rear yard
Maximum 2 metres (7 ft). This is the height most privacy fences are built to.
Side yard
Maximum 1.8 metres (6 ft).
Front yard
Maximum 1 metre (3 ft). This catches people out: you cannot simply continue a 6-foot fence around to the front.
Privacy screens
Allowed up to 3 metres (9 ft 10 in) in sections of up to 9 metres, but they must sit at least 1.2 m from a side or rear lot line and 4.5 m from the front lot line.
Fence permit
Not required for a normal residential fence in Newmarket, with one important exception below.
Pool enclosures
A permit is required, and every pool needs an enclosure regardless of when it was installed. Separate application, separate inspection.
Before digging
Call Ontario One Call on 1-800-400-2255. It is free, it is the law, and a fence line is exactly where buried services tend to run.

We build to the by-law and tell you at quoting stage if what you have asked for is over the limit. Nobody enjoys taking a fence down twice.

How We Install a Fence, Start to Finish

Step 1

Site visit and line check

We walk the run with you, look at your survey, check the grade and confirm heights against the by-law. Then you get a written quote per linear foot with the gate priced separately.

Step 2

Locates and layout

Ontario One Call for services, then we string the line and mark every post position before anything is dug.

Step 3

Posts

Augered below the frost line, set plumb in concrete, braced and left to cure. This is the day that decides the next fifteen years.

Step 4

Rails, boards and gates

Rails on, boards fastened with hot-dipped or stainless fixings, tops cut level to the grade, gates hung and adjusted.

Step 5

Clean-up and walk-round

Old fence and spoil hauled away, gate swing tested with you, and we go round the run together before we leave.

Ready to start?

Tell us the run and we will walk it with you, check the by-law and quote it, free and with no pressure.

Book My Site Visit

Fences and Privacy Screens We've Built

Pressure-treated privacy fencing with horizontal slat toppers, and privacy screens built into decks, all from our jobs in and around Newmarket.

What Affects the Cost of a Fence

Fencing is usually quoted per linear foot, but these are the things that move that rate.

Length and height

A 6-foot fence uses more board and bigger posts than a 4-foot one over the same run.

Material

Pressure-treated, treated posts with cedar boards, full cedar, then composite and vinyl.

Removing the old fence

Especially digging out old concrete footings, which is slow work.

Grade and obstacles

A sloping run needs stepped or racked panels. Tree roots, rock and buried services all cost time.

Gates

Every gate is a small build of its own: bracing, hardware, and getting it to swing true.

Access

If a machine cannot reach the line, every hole is dug by hand and the labour reflects it.

Fence Specialists Building Privacy That Lasts Through Ontario Winters.

Book a Fence Consultation

Frequently Asked Questions

Under the Town of Newmarket fence by-law, a rear-yard fence can be up to 2 metres (7 ft), a side-yard fence up to 1.8 metres (6 ft), and a front-yard fence only 1 metre (3 ft). A privacy screen is allowed up to 3 metres but must be set back at least 1.2 m from side and rear lot lines.

Not for a normal residential fence. The exception is a pool enclosure, which does require a permit, and in Ontario every pool needs an enclosure regardless of when it was built.

Below the frost line, roughly 1.2 metres (4 ft) in our area, set in concrete. Shallower posts heave, and a heaved post takes the whole panel with it. It is the single most common reason we are called out to fix someone else's fence.

A fence on the boundary is generally a shared responsibility under Ontario's Line Fences Act, and costs are normally split. In practice it goes far better if you talk to your neighbour before you book the work rather than after the posts go in.

Yes, and often we should. If one section blew down or a few posts have rotted, replacing that run is far cheaper than doing the whole perimeter. We will match the existing style as closely as the material still allows.

Most residential fences are a two to four day job, split across two visits so the post concrete can cure before rails and boards go on. Removing an old fence adds a day.

Yes, but not immediately. Let it dry out for a season first, then stain. It will hold colour far better and you will get several more years before the boards start to check and grey.

Newmarket, Aurora, Bradford, Keswick, King City, Nobleton, Richmond Hill, Vaughan, Kawartha Lakes and Muskoka.

Related Services

We build the rest of the backyard too. If you are planning more than one thing, it is usually cheaper and tidier to do them together: pergola installation and repair, gazebo building in Newmarket, deck railing and bench installation and custom deck building.

Areas we serve in Newmarket

L4G

L3X 1Y9

L3X 1N3

L3Z

L3Y 9C1

L3Y 8X#

L0G 1H0

L9N 1H0

L3X 2N8

XP Decking

Custom Deck Building Solutions

Business Hour

Monday to Friday: 9 am to 5 pm
Saturday: 9 am to 1 pm
Sunday: Closed